Fronius releases | Perth system design

Fronius Backup Controller 63 A Perth

The Fronius Backup Controller 63 A is automatic switching hardware for a compatible Fronius Full Backup system. Australis Solar assesses the inverter, battery, supply and backed-up loads together, including whether Parallel Backup suits a larger three-phase installation.

WA-owned since 2008 · In-house installation · Local support

Australis Solar Fronius installation showing EV charging and an existing backup switchbox
Local Fronius installation in Nedlands. This is an existing backup switchbox installation, not a photograph of the new 63 A controller.
63 AController rating, not battery output
<20 msRapid switching on supported configurations
Full BackupRequires compatible equipment and setup

What does the 63 A Backup Controller do?

During an outage, the controller isolates a suitable backup installation from the public grid so a compatible inverter and battery can supply the designated circuits. It also manages the return to grid operation when the required conditions are met.

The controller is one part of the system. Its 63 A rating does not describe battery discharge power or guarantee that all household loads can run simultaneously.

Automatic switching

A compatible Full Backup installation can change operating mode automatically. Equipment selection, wiring and commissioning determine the result.

Rapid Switch Mode

Fronius describes switching in less than 20 milliseconds with the 63 A controller and supported inverter configuration. Exact model and firmware checks apply.

A planned backup scope

We identify the circuits, appliances and load limits in the proposal, then test the installed backup function at commissioning.

How is Full Backup different from PV Point?

PV Point is a limited backup function on compatible Fronius models. It is different from a Full Backup installation designed to supply a wider set of property circuits.

Full Backup needs a suitable GEN24 Plus or Verto Plus inverter, compatible battery storage and the required switching hardware and configuration. A battery purchase alone does not provide automatic whole-home blackout protection.

Fast switching is not a universal uninterrupted power guarantee

Rapid Switch Mode is configuration-dependent. Sensitive equipment may need dedicated protection appropriate to the application. We confirm the intended operating behaviour and test the completed system.

What is Fronius Parallel Backup?

Parallel Backup allows supported three-phase Fronius inverters to operate together in backup mode. The published arrangement uses 1 coordinator and up to 4 supporter inverters. Batteries connect to the coordinator in this arrangement; it is not a general promise that every inverter can have its own battery.

The release material identifies suitable Symo GEN24 Plus and Verto Plus coordinator models, with compatible Symo GEN24 and Verto supporters. The exact product combination, firmware and additional control wiring must be checked against current Fronius instructions.

Parallel Backup can be relevant to a larger property with multiple solar inverters. It requires a specific electrical design and current network assessment. Single-phase support and other future functions should not be assumed from a three-phase release.

Explore Verto Plus hybrid systems and Reserva Pro battery capacity options.

What will Australis Solar check at your property?

  1. Supply phase, service rating, switchboard space and existing protection.
  2. Exact inverter models, battery configuration, firmware and compatible switching hardware.
  3. Essential circuits, phase loading, appliance starting currents and maximum simultaneous demand.
  4. Battery reserve, expected outage use, equipment location and cable routes.
  5. Current connection requirements, commissioning tests and handover instructions.

For perspective, 10 kWh of available energy supplying a steady 1 kW load is approximately 10 hours before losses and operating limits. Actual runtime changes with the load, battery reserve, solar conditions and system limits. Use our battery sizing guide to prepare your priorities.

See our Nedlands Fronius battery and backup case study for an installed system example. Its existing switching hardware is not presented as the new controller.

Your questions answered

Can the controller back up my whole home?

Potentially, with a suitable system design. Circuit coverage, inverter power, battery output and available energy must support the intended loads. We confirm any exclusions and limits in the proposal.

Can the new controller replace my existing backup box?

This requires an assessment. Compatibility, supply rating, wiring, switchboard condition and firmware determine whether a retrofit is practical. A replacement is not automatically a direct swap.

Does the controller increase battery capacity?

No. Switching hardware does not add stored energy. Battery capacity and charging/discharging power must be selected separately.

Will every Fronius inverter support Parallel Backup?

No. Only specified combinations and supported firmware are suitable. We check the current Fronius compatibility information for every coordinator and supporter before including the function.

Plan Fronius backup around the loads that matter

Australis Solar is Perth-based and WA-owned, operating since 2008. Our accredited in-house installers and licensed electricians handle system design, installation, commissioning and ongoing support.

Send a recent Synergy bill, property address, switchboard photos and existing inverter details. We assess roof space, shading, electricity use, cable routes, equipment location and future loads before preparing your proposal.

Final pricing, equipment availability, product eligibility and network connection conditions are confirmed for your installation. Applicable battery incentives are generally a one-time application per household; later expansion should not be planned around a second rebate.