Mullaloo returning-client case study

Mullaloo Solar and Sigenergy Battery Upgrade for Stored Solar

A Mullaloo homeowner returned to Australis Solar to add 24kWh of Sigenergy battery storage to their existing 6.6kW Trina solar system. The original single-phase installation was completed in February 2025, followed by the battery addition in November 2025.

Our Perth-based, WA-owned team built on the existing 5kW Sigenergy system rather than replacing the solar array. Explore the two-stage installation below, or request an assessment of your own solar and battery options.

  • 15 × Trina 440W panels retained
  • Three 8kWh battery modules added later
  • Battery storage for grid-connected use, without blackout backup in the recorded scope
Sigenergy controller and battery stack at the Mullaloo home
Solar first, battery storage later at the same Mullaloo home.

Confirmed installation records

Mullaloo project snapshot

The original solar installation and later battery addition form two stages of the same property’s energy upgrade.

LocationMullaloo, WAReturning residential customer
Original solar6.6kW Trina15 × 440W Vertex S+ panels
Original completionFebruary 2025Solar replacement and new controller
Inverter retained5kW SigenergySingle phase, battery-ready platform
Battery additionNovember 2025Three Sigenergy 8kWh modules
Recorded storage24kWhEnergy capacity, not simultaneous appliance power
Metering additionSigen Power SensorSingle-phase external CT sensor
Backup scopeNo blackout backupExcluded from the battery job scope

A practical two-stage upgrade

Customer objective and property considerations

The project evolved from replacing an older solar system to adding storage when the homeowner was ready.

Solar before storage

The original works replaced an older 2.4kW solar system with 15 Trina panels and a 5kW battery-ready Sigenergy inverter.

The homeowner initially chose solar without a battery, retaining a pathway to add storage later.

Roof-restoration sequencing

The original job was planned in stages around roof restoration: remove the old equipment and prepare the roof works, then return to complete the new solar installation.

This allowed the solar works and roof restoration to be coordinated at the same property.

A later return for batteries

The later completed job explicitly identifies the original solar installation and adds three battery modules and a power sensor.

The new scope provides storage for grid-connected operation. Blackout backup was not included.

Retain solar, add storage

Installed system and equipment

The later works added batteries and metering to the existing Sigenergy installation.

Solar generation

15 × Trina Vertex S+ 440W panels

The original 6.6kW array and Clenergy rails and racking were retained with the later battery works.

Explore solar panels →
Existing platform

5kW single-phase Sigenergy inverter

The homeowner chose a battery-ready inverter during the original solar installation, providing the platform for the later storage addition.

Explore Sigenergy systems →
Stored energy

Three 8kWh battery modules

The completed battery scope records 24kWh of Sigenergy storage. Battery energy capacity differs from available output power, which is limited by the equipment and operating settings.

Explore solar batteries →
Energy monitoring

Single-phase Sigen Power Sensor

The battery addition included a Sigen Power Sensor with an external current transformer to support system energy measurement and control.

Explore solar upgrades →

The installation decisions

Challenges and Australis Solar solutions

Roof sequencing, equipment retention and a clear battery scope shaped this project.

Coordinate solar with roof restoration

Challenge

The old system needed removal and roof restoration was planned.

Australis Solar assessment

The solar job notes set out separate preparation and completion visits.

Australis Solar solution

Sequence the removal and preparatory works before the roof restoration, then complete the rails, panels and inverter installation.

Build on the first installation

Challenge

The homeowner later wanted batteries for the solar system already installed.

Australis Solar assessment

The battery job identifies the original 6.6kW Trina array and 5kW Sigenergy inverter.

Australis Solar solution

Retain the existing solar platform and add three 8kWh battery modules with single-phase energy metering.

Keep the backup scope clear

Challenge

Battery storage can be mistaken for guaranteed power during a blackout.

Australis Solar assessment

The completed battery scope expressly excludes backup power to house circuits during grid failure.

Australis Solar solution

Describe this as a grid-connected battery addition. Assess any future backup request separately, including switching hardware, electrical configuration and appliance loads.

Mullaloo project questions

Solar and battery upgrade FAQs

Was the battery installed with the original solar system?

No. The original solar installation was completed in February 2025. The later battery addition was completed in November 2025.

How much solar and storage does the recorded system have?

The original array is 6.6kW, using 15 Trina 440W panels. The later battery job records three 8kWh Sigenergy modules, totalling 24kWh.

Was the existing solar system replaced again for the batteries?

The battery scope identifies the existing 6.6kW solar array and 5kW Sigenergy inverter. It adds battery modules and a single-phase power sensor rather than another solar array.

Does this battery addition provide blackout backup?

No blackout backup was included in the recorded battery scope. Battery storage alone should not be taken as confirmation that house circuits will stay powered during a grid outage.

What savings has the battery achieved?

Measured savings are not available for this case study. Actual results depend on solar generation, usage timing, tariffs and system settings. Earlier proposal estimates are not presented as measured battery results.

Can I add a battery to my Perth solar system?

Australis Solar assesses the exact inverter and panels, electricity use, switchboard, battery location, backup requirements and future plans. Quotes are subject to a site visit and switchboard inspection.

Request a property-specific design

Plan the next stage of your Perth solar system

Send us your latest Synergy bill and details of your existing solar. Our team will assess your usage, generation, inverter, switchboard, battery location, backup needs and future EV plans before recommending an upgrade.

Australis Solar is Perth-based, WA-owned and operating since 2008. Our in-house SAA-accredited installers and licensed electricians support your project from design to handover and aftercare. Quotes are subject to a site visit and switchboard inspection.