Gwelup installation case study

Gwelup Solar, battery and backup installation

At this Gwelup new build, Australis Solar installed 13.63kW of AIKO panels, a 10kW three-phase Sigenergy SigenStor controller, 16kWh of storage and a Gateway. The design addressed a steep metal roof, roof orientation, battery positioning and vehicle protection.

Sigenergy SigenStor battery and protective bollard at the Gwelup home
Sigenergy SigenStor battery and protective bollard at the Gwelup home.

Installation specifications

Gwelup project snapshot

Location

Gwelup, WA

Installation year

2025

Solar capacity

13.63kW

Solar panels

29 × AIKO Neostar 2P 470W panels

Inverter

Sigenergy SigenStor 10kW three-phase controller

Battery storage

16kWh, two 8kWh Sigen battery modules

Backup

Sigenergy three-phase Gateway for full-house backup

Additional equipment

Protective bollard

Designed for this property

Customer objective and design considerations

Steep double-storey roof

The metal roof and its screw lines required planning for panel placement.

Available roof orientations

Limited space in the preferred orientations influenced the array layout and electrical string design.

Battery position

A site visit checked the proposed equipment position and distances before installation.

Backup and protection

The system includes full-house Gateway backup and a bollard for vehicle impact protection.

Installed equipment

System design and installed components

Solar array

29 × AIKO Neostar 2P 470W panels provide 13.63kW of installed panel capacity.

Inverter

Sigenergy SigenStor 10kW three-phase controller.

Battery storage

16kWh, two 8kWh Sigen battery modules.

Backup

Sigenergy three-phase Gateway for full-house backup.

Installation equipment

Protective bollard.

Project energy and savings figures

  • Annual generation: 19,780kWh per year

Project-specific installation work

Challenges and Australis Solar solutions

Complex roof layout

Challenge

The double-storey metal roof had limited optimal orientation space and particular screw lines.

Australis Solar assessment

Shading analysis, roof orientation and electrical string design were considered together.

Australis Solar solution

Some panels were installed in landscape orientation to make use of the available roof space.

Battery placement

Challenge

The battery location and equipment distances needed to be assessed before work began.

Australis Solar assessment

The team carried out a site visit to measure the location and distances.

Australis Solar solution

The SigenStor battery and Gateway were installed with a protective bollard.

Stored energy and backup

Challenge

The project included night-time energy use and outage protection.

Australis Solar assessment

Storage and Gateway backup were included in the system design.

Australis Solar solution

Two 8kWh battery modules provide 16kWh of storage, with a Sigenergy Gateway for full-house backup.

Gwelup project questions

What solar panels were installed in Gwelup?

29 × AIKO Neostar 2P 470W panels, providing 13.63kW of solar capacity.

Which inverter was installed?

Sigenergy SigenStor 10kW three-phase controller.

What battery storage was installed?

16kWh, two 8kWh Sigen battery modules.

What affected the installation design?

The metal roof and its screw lines required planning for panel placement. Limited space in the preferred orientations influenced the array layout and electrical string design. A site visit checked the proposed equipment position and distances before installation. The system includes full-house Gateway backup and a bollard for vehicle impact protection.

Request a property-specific design

Planning solar in Gwelup?

Australis Solar is Perth-based and WA-owned, operating since 2008. Send us your Synergy bill and property details so the system can be assessed around your roof, electricity use, existing electrical equipment and future battery or EV plans.

Explore solar panels for Perth homes, battery storage and upgrades to existing solar systems.