Mount Hawthorn, WA · Residential solar project

Mount Hawthorn Trina solar installation

Australis Solar completed this 6.6kW solar installation in Mount Hawthorn in October 2024, using Trina Vertex S+ 440W panels and a 5kW Fronius Symo GEN24.

Solar panels installed at the Mount Hawthorn property
The solar array at the Mount Hawthorn property.

Project specifications

Location
Mount Hawthorn, WA
Completed
October 2024
Solar capacity
6.6kW
Solar panels
15 × Trina Vertex S+ 440W
Inverter
5kW Fronius Symo GEN24
Electrical supply
Three phase
Mounting
Clenergy rails and racking

About this installation

The existing switchboard and tiled roof were considered when planning this Mount Hawthorn installation. The completed system combines 15 Trina panels, a three-phase Fronius Symo GEN24 inverter and Clenergy mounting equipment.

The inverter was supplied as hybrid-upgradable equipment. A future battery addition requires a separate compatibility and site assessment; battery provision is not presented as an installed battery.

This project records equipment installed in 2024. Equipment shown may differ from our current product range.

Plan your next installation

Discuss your solar project with Australis Solar

Talk to our Perth team about your property, electricity use and plans. We will assess the site and existing equipment before recommending a suitable system.